- Bridge Design & Inspection
- Civil/Site
- Environmental
- Featured
- GIS
- Hydrologic and Hydraulic Modeling
- Municipalities/Townships
- Philadelphia Area
- State College
- Stormwater Planning and Design
- Technical Training and Course Development
- Transportation Design
NTM Celebrates 15 Years of Excelled Growth
PRESS RELEASE January 26, 2022, Dillsburg, PA — NTM Engineering, Inc. (NTM) is proud to celebrate ...
Guyer Part of Volunteer Design Team for Colyer Lake Footbridges
NTM Project Engineer, Robert Guyer, MS, PE, CBSI, was part of a volunteer design team to design and ...
NTM Named to 2021 Best Places to Work in PA List
NTM is proud to announce we were named to the Best Places to Work in PA list for the 8th year in a r...
NTM Assists Lehigh University with GIS Services
Lehigh University received notice from the City of Bethlehem that they would be required to pay a st...
Public Safety Facilities Master Plan
NTM Engineering, Inc. (NTM) was contracted by Hill International (Hill) to design and assess the bui...
Barry Playground Green Stormwater Infrastructure
Barry Playground is located in South Philadelphia and is a 2,700 square foot building which includes...
Ferguson Township Stormwater Engineer
NTM Engineering, Inc. (NTM) has been the appointed Ferguson Township, Centre County Stormwater Engin...
SR 0092 Emergency Culvert Replacement
This project involves the emergency replacement of the SR 0092 Section EMG (locally known as Exeter ...
SR 2004-A02 over Jacks Creek Hydrologic and Hydraulics Study
NTM performed a hydrologic and hydraulic (H&H) analysis of the SR 2004-A01 Back Maitland Road ov...
SR 2035-352 over Mud Run Creek Bridge Replacement
The SR 2035 Section 352 project involved replacing state-owned, temporary pipe culverts that conveye...
SR 220 Section 122 Williamsport to Jersey Shore Safety Corridor Improvements
NTM provided the hydrologic and hydraulic (H&H) analysis, preliminary and final infiltration tes...
PA 901 Section 01B and PA 3005 Bridge Replacement over Branch of Schuylkill River
NTM performed the complete design of the PA 901 Section 01B Bridge Replacement over a Branch of the ...
SR 3018 Section N10 Whitehall Road and University Drive Extension Widening
NTM Engineering developed the Erosion and Sediment Pollution Control (E&SPC) Plan and Post-Const...
Penn State University Reuse Study
NTM Engineering conducted a Stormwater Reuse Study for the Pennsylvania State University (PSU) Offic...
West Campus Stormwater Management Feasibility Study
NTM was contracted to provide a Stormwater Management Feasibility Study as part of an overall feasib...
SR 3014 Atherton Street Corridor Highway Improvement Projects
For the SR 3014 Atherton Street Corridor Highway Improvement Projects agreement in Centre County, NT...
No More Posts