NTM Engineering, Inc.

  • NTM Engineering, Inc.
  • Home
  • About
    • Meet Our Firm
    • Our Team
    • Professional Affiliations & Certifications
    • NTM Awards
  • Careers
    • Our Culture
    • In the Community
    • Learning & Professional Development
    • Educational Resources
  • Services
    • Core Services
    • Hydrologic and Hydraulic Modeling
    • Stormwater Planning & Design
    • Bridge Design and Inspection
    • Transportation Design
    • Environmental
  • Training
    • Training Development and Delivery
    • NTM Training
      • Introduction to HEC-RAS
      • BMPs for Erosion and Sediment Control Plans
  • Projects
  • News
  • Contact

BMPs for Erosion and Sediment Control Plans

A critical component of any land development or highway plan and earthmoving permit is the Erosion and Sediment Control (E&S) Plan. Inadequate design of E&S best management practices (BMPs) results in plan re-submissions and project delays, while over-design leads to unnecessary project costs. Eliminate multiple plan submissions and reduce your client’s project costs by attending this course, which focuses on the selection and design of E&S BMPs using the PA DEP Erosion and Sediment Pollution Control Program Manual.

Every participant will receive a course binder containing annotated lectures and step-by-step instructions for designing E&S BMPs. No computer is required.

Topics include:

  • Proper selection and cost-effective design of various E&S BMPs
  • Design considerations in special protection watersheds and areas adjacent to streams and wetlands
  • Cost savings opportunities

Upon successful completion of the course, attendees will be able to:

  • Identify cost-savings opportunities associated with E&S Plans
  • Avoid common design errors that result in plan re-submissions
  • Design various types of perimeter sediment controls
  • Select and design appropriate channel lining
  • Locate and design sediment basins and traps
  • Properly size rock outlet protection
  • Modify BMP specifications in sensitive areas

Cancellation Policy: Cancellations made more than 10 days before the course will be fully refunded (minus any registration platform fees). Registrations cancelled within 6 to 10 days of the course will receive a 50% reimbursement. Cancellations within 5 days or less and no-shows will not receive a refund. Substitutions of another individual are permitted if you are unable to attend.

Stay in the loop! Sign up to receive email about NTM Training Center courses.

Select list(s) to subscribe to


By submitting this form, you are consenting to receive marketing emails from: NTM Engineering, Inc., 130 W. Church St., Suite 200, Dillsburg, USA, PA, 17019, http://www.ntmeng.com. You can revoke your consent to receive emails at any time by using the SafeUnsubscribe® link, found at the bottom of every email. Emails are serviced by Constant Contact

Featured Training Projects

DelDOT Bridge Design Manual

DelDOT Bridge Design Training and Manual

Ch10

PennDOT H&H & Permitting Procedures: DM-2 Chapter 10

More Training projects...

NTM Engineering, Inc.
130 West Church Street, Suite 200
Dillsburg, PA 17019-1278
Phone: (717) 432-4425
Fax: (717) 432-4426

State College Office
341 Science Park Road, Suite 203
State College, PA 16803
Phone: (814) 862-9191

Wayne Office
1285 Drummers Lane
Suite 105
Wayne, PA 19087
Phone: (610) 605-3104

Search

  • Instagram
  • LinkedIn
  • Twitter
  • YouTube
  • H&H
  • Stormwater IconStormwater
  • Bridge IconBridge
  • Transportation IconTransportation
  • Training IconTraining
  • Environmental

Copyright © 2026 NTM Engineering, Inc.· All rights reserved.