NTM Engineering, Inc.

  • NTM Engineering, Inc.
  • Home
  • About
    • Meet Our Firm
    • Our Team
    • Professional Affiliations & Certifications
    • NTM Awards
  • Careers
    • Careers at NTM
    • Our Culture
    • In the Community
    • Learning & Professional Development
    • Educational Resources
  • Services
    • Core Services
    • Hydrologic and Hydraulic Modeling
    • Stormwater Planning & Design
    • Bridge Design and Inspection
    • Transportation Design
    • Environmental
    • Civil/Site Services
  • Training
    • Training Development and Delivery
    • NTM Training
      • Introduction to HEC-RAS
      • BMPs for Erosion and Sediment Control Plans
  • Projects
  • News
  • Contact

BMPs for Erosion and Sediment Control Plans

A critical component of any land development or highway plan and earthmoving permit is the Erosion and Sediment Control (E&S) Plan. Inadequate design of E&S best management practices (BMPs) results in plan re-submissions and project delays, while over-design leads to unnecessary project costs. Eliminate multiple plan submissions and reduce your client’s project costs by attending this course, which focuses on the selection and design of E&S BMPs using the PA DEP Erosion and Sediment Pollution Control Program Manual.

Every participant will receive a course binder containing annotated lectures and step-by-step instructions for designing E&S BMPs. No computer is required.

Topics include:

  • Proper selection and cost-effective design of various E&S BMPs
  • Design considerations in special protection watersheds and areas adjacent to streams and wetlands
  • Cost savings opportunities

Upon successful completion of the course, attendees will be able to:

  • Identify cost-savings opportunities associated with E&S Plans
  • Avoid common design errors that result in plan re-submissions
  • Design various types of perimeter sediment controls
  • Select and design appropriate channel lining
  • Locate and design sediment basins and traps
  • Properly size rock outlet protection
  • Modify BMP specifications in sensitive areas

Cancellation Policy: Cancellations made more than 10 days before the course will be fully refunded (minus any registration platform fees). Registrations cancelled within 6 to 10 days of the course will receive a 50% reimbursement. Cancellations within 5 days or less and no-shows will not receive a refund. Substitutions of another individual are permitted if you are unable to attend.

Training Icon

Featured Training Projects

DelDOT Bridge Design Manual

DelDOT Bridge Design Training and Manual

Ch10

PennDOT H&H & Permitting Procedures: DM-2 Chapter 10

More Training projects...

NTM Engineering, Inc.
130 West Church Street, Suite 200
Dillsburg, PA 17019-1278
Phone: (717) 432-4425
Fax: (717) 432-4426

State College Office
341 Science Park Road, Suite 203
State College, PA 16803
Phone: (814) 862-9191

Philadelphia Office
30 North 41st Street, Suite 520
Philadelphia, PA 19104
Phone: (215) 397-4055

Wayne Office
435 Devon Park Drive
Building 800, Suite 803
Wayne, PA 19087
Phone: (610) 605-3104

Search

  • Instagram
  • LinkedIn
  • Twitter
  • YouTube
  • H&H
  • Stormwater IconStormwater
  • Bridge IconBridge
  • Transportation IconTransportation
  • Training IconTraining
  • Site/Civil ServicesCivil/Site
  • Environmental

Copyright © 2025 NTM Engineering, Inc.· All rights reserved.